14 stations
AngrignonTerminus
⬇ UGZ1+0 min
Angrignon area · Angrignon area
3.6 min · 1.7 km
Jolicoeur
⬇ UGZ1+3.6 min
3.6 min · 1.7 km
Lionel-Groulx
⬇ UGZ1+7.2 min
Lionel-Groulx area · Lionel-Groulx area · Lionel-Groulx area
3.6 min · 1.7 km
Atwater
⬇ UGZ1+10.8 min
3.6 min · 1.7 km
Guy-Concordia
⬇ UGZ1+14.4 min
3.6 min · 1.7 km
Peel
⬇ UGZ1+18 min
3.6 min · 1.7 km
McGill
⬇ UGZ1+21.6 min
3.6 min · 1.7 km
Place-des-Arts
⬇ UGZ1+25.2 min
3.6 min · 1.7 km
Saint-Laurent
⬇ UGZ1+28.8 min
3.6 min · 1.7 km
Beaudry
⬇ UGZ1+36 min
3.6 min · 1.7 km
Papineau
⬇ UGZ1+39.6 min
3.6 min · 1.7 km
Pie-IX
⬇ UGZ1+43.2 min
3.6 min · 1.7 km
Honoré-BeaugrandTerminus
⬇ UGZ1+46.8 min
Honoré-Beaugrand area · Honoré-Beaugrand area
About Green Line (1)
The Green Line (1) (Green Line (1)) runs 22.1 km from Angrignon to Honoré-Beaugrand, serving 14 stations. Green Line (1) of the Montreal Metro.
The line opened in 1966. An end-to-end journey takes about 47 minutes. Of the 14 stations, 14 are underground and 0 are elevated, with 2 interchange station(s) connecting to the wider network.
Frequently asked questions
Green Line (1) at a glance
Line numberGreen Line (1)
Stations14
Length22.1 km
Opened1966-10-14
TypeStandard gauge
Electrification750 V DC third rail
Daily ridership350,000
PhasePhase 1
Plan your journey
Find the best route across all lines