Orange (Richmond–Berryessa)BART

Orange (Richmond–Berryessa)

RichmondBerryessa/North San José · Orange (Richmond–Berryessa) of the BART (San Francisco Bay Area).

12
Estaciones
55 km
Longitud total
1972
Año de apertura
~106 min
Tiempo total
Planifica una ruta en esta línea

12 estaciones

RichmondTerminal
⬇ UGZ1+0 min
Richmond area · Richmond area
9.6 min · 5.0 km
El Cerrito del Norte
⬇ UGZ1+9.6 min
9.6 min · 5.0 km
MacArthur
⬇ UGZ1+19.2 min
MacArthur area · MacArthur area · MacArthur area
9.6 min · 5.0 km
19th St Oakland
⬇ UGZ1+28.8 min
Downtown Oakland · Downtown Oakland · Downtown Oakland
9.6 min · 5.0 km
12th St Oakland
⬇ UGZ1+38.4 min
Oakland City Center · Oakland City Center · Oakland City Center
9.6 min · 5.0 km
Lake Merritt
⬇ UGZ1+48 min
Lake Merritt area · Lake Merritt area · Lake Merritt area
9.6 min · 5.0 km
Fruitvale
⬇ UGZ1+57.6 min
9.6 min · 5.0 km
Coliseum
⬇ UGZ1+67.2 min
Oakland Coliseum · Oakland Coliseum · Oakland Coliseum
9.6 min · 5.0 km
Bay Fair
⬇ UGZ1+76.8 min
Bay Fair area · Bay Fair area · Bay Fair area
9.6 min · 5.0 km
Fremont
⬇ UGZ1+86.4 min
9.6 min · 5.0 km
Milpitas
⬇ UGZ1+96 min
9.6 min · 5.0 km
San José · San José

Acerca de Orange (Richmond–Berryessa)

La Orange (Richmond–Berryessa) (Orange (Richmond–Berryessa)) recorre 55 km de Richmond a Berryessa/North San José y sirve 12 estaciones. Orange (Richmond–Berryessa) of the BART (San Francisco Bay Area).

La línea se inauguró en 1972. Un viaje completo dura unos 106 minutos. De las 12 estaciones, 12 son subterráneas y 0 elevadas, con 3 estación(es) de transbordo que conectan con la red.

Preguntas frecuentes

Orange (Richmond–Berryessa) de un vistazo

Número de líneaOrange (Richmond–Berryessa)
Estaciones12
Longitud55 km
Apertura1972-09-11
TipoAncho estándar
Electrificación750 V DC third rail
Pasajeros diarios60,000
FaseFase 1

Planifica tu viaje

Encuentra la mejor ruta en todas las líneas

Abrir planificador