Line 2 (Bloor–Danforth)Toronto Subway · TTC

Line 2 (Bloor–Danforth)

KiplingKennedy · Line 2 (Bloor–Danforth) of the Toronto Subway.

14
Estações
26.2 km
Comprimento total
1966
Ano de abertura
~55 min
Tempo total
Planejar uma rota nesta linha

14 estações

KiplingTerminal
⬇ UGZ1+0 min
Kipling area · Kipling area
4.2 min · 2.0 km
Islington
⬇ UGZ1+4.2 min
4.2 min · 2.0 km
Jane
⬇ UGZ1+8.4 min
4.2 min · 2.0 km
Dundas West
⬇ UGZ1+12.6 min
4.2 min · 2.0 km
Lansdowne
⬇ UGZ1+16.8 min
4.2 min · 2.0 km
Spadina
⬇ UGZ1+21 min
Spadina area · Spadina area · Spadina area
4.2 min · 2.0 km
St George
⬇ UGZ1+25.2 min
University of Toronto · University of Toronto · University of Toronto
4.2 min · 2.0 km
Bay
⬇ UGZ1+29.4 min
4.2 min · 2.0 km
Bloor–Yonge
⬇ UGZ1+33.6 min
Yorkville · Yorkville · Yorkville
4.2 min · 2.0 km
Castle Frank
⬇ UGZ1+37.8 min
4.2 min · 2.0 km
Broadview
⬇ UGZ1+42 min
4.2 min · 2.0 km
Pape
⬇ UGZ1+46.2 min
4.2 min · 2.0 km
Main Street
⬇ UGZ1+50.4 min
4.2 min · 2.0 km
KennedyTerminal
⬇ UGZ1+54.6 min
Kennedy area · Kennedy area

Sobre Line 2 (Bloor–Danforth)

A Line 2 (Bloor–Danforth) (Line 2 (Bloor–Danforth)) percorre 26.2 km de Kipling a Kennedy, servindo 14 estações. Line 2 (Bloor–Danforth) of the Toronto Subway.

A linha foi inaugurada em 1966. Uma viagem completa leva cerca de 55 minutos. Das 14 estações, 14 são subterrâneas e 0 elevadas, com 3 estação(ões) de baldeação ligando à rede.

Perguntas frequentes

Line 2 (Bloor–Danforth) num relance

Número da linhaLine 2 (Bloor–Danforth)
Estações14
Comprimento26.2 km
Aberta1966-02-25
TipoBitola padrão
Eletrificação750 V DC third rail
Passageiros diários520,000
FaseFase 1

Planeje sua viagem

Encontre a melhor rota em todas as linhas

Abrir planejador