32 stations
MadavaraTerminus
⬆ ELZ1+0 min
2.5 min · 1.1 km
Chikkabidarakallu
⬆ ELZ1+2.5 min
2.5 min · 1.1 km
Manjunathanagara
⬆ ELZ1+5 min
2.5 min · 1.1 km
Nagasandra
⬆ ELZ1+7.5 min
2.5 min · 1.1 km
Dasarahalli
⬆ ELZ1+10 min
2.5 min · 1.1 km
Jalahalli
⬆ ELZ1+12.5 min
2.5 min · 1.1 km
Peenya Industry
⬆ ELZ1+15 min
2.4 min · 1.1 km
Goraguntepalya
⬆ ELZ1+19.9 min
2.5 min · 1.1 km
Yeshwanthpur
⬆ ELZ1+22.4 min
2.5 min · 1.1 km
Sandal Soap Factory
⬆ ELZ1+24.9 min
2.5 min · 1.1 km
Mahalakshmi
⬆ ELZ1+27.4 min
2.5 min · 1.1 km
Rajajinagar
⬆ ELZ1+29.9 min
2.5 min · 1.1 km
Mahakavi Kuvempu Road
⬆ ELZ1+32.4 min
2.5 min · 1.1 km
Srirampura
⬆ ELZ1+34.9 min
About Green Line
The Green Line (Line 2) runs 33.46 km from Madavara to Silk Institute, serving 32 stations. North-south corridor. Interchanges with Purple Line at Majestic and Yellow Line at Rashtreeya Vidyalaya Road.
The line opened in 2014. An end-to-end journey takes about 77 minutes. Of the 32 stations, 3 are underground and 29 are elevated, with 4 interchange station(s) connecting to the wider network.
Frequently asked questions
Green Line at a glance
Line numberLine 2
Stations32
Length33.46 km
Opened2014-03-01
TypeStandard gauge
Electrification750 V DC third rail
Daily ridership360,000
PhasePhase 1_and_2
Plan your journey
Find the best route across all lines