Line 3Hyderabad Metro · HMRL

Blue Line

NagoleRaidurg · East-west corridor from Nagole to Raidurg serving the IT corridor (HITEC City, Madhapur). Interchanges with the Red Line at Ameerpet and the Green Line at Parade Ground.

23
Stations
28.99 km
Total length
2018
Year opened
~64 min
End-to-end time
Plan a route on this line

23 stations

NagoleTerminus
⬆ ELZ1+0 min
Nagole · Nagole
2.9 min · 1.3 km
Uppal
⬆ ELZ1+2.9 min
2.9 min · 1.3 km
Stadium
⬆ ELZ1+5.8 min
2.9 min · 1.3 km
NGRI
⬆ ELZ1+8.7 min
2.9 min · 1.3 km
Habsiguda
⬆ ELZ1+11.6 min
2.9 min · 1.3 km
Tarnaka
⬆ ELZ1+14.5 min
2.9 min · 1.3 km
Mettuguda
⬆ ELZ1+17.4 min
2.9 min · 1.3 km
Secunderabad East
⬆ ELZ1+20.3 min
2.9 min · 1.3 km
Parade Ground
⬆ ELZ1+23.2 min
Parade Ground · Secunderabad · Parade Ground
2.9 min · 1.3 km
Paradise
⬆ ELZ1+26.1 min
2.9 min · 1.3 km
Rasoolpura
⬆ ELZ1+29 min
2.9 min · 1.3 km
Prakash Nagar
⬆ ELZ1+31.9 min
2.9 min · 1.3 km
Begumpet
⬆ ELZ1+34.8 min
2.9 min · 1.3 km
Ameerpet
⬆ ELZ1+37.7 min
Ameerpet · Maitrivanam · Ameerpet
2.9 min · 1.3 km
Madhura Nagar
⬆ ELZ1+40.6 min

About Blue Line

The Blue Line (Line 3) runs 28.99 km from Nagole to Raidurg, serving 23 stations. East-west corridor from Nagole to Raidurg serving the IT corridor (HITEC City, Madhapur). Interchanges with the Red Line at Ameerpet and the Green Line at Parade Ground.

The line opened in 2018. An end-to-end journey takes about 64 minutes. Of the 23 stations, 0 are underground and 23 are elevated, with 2 interchange station(s) connecting to the wider network.

Frequently asked questions

Blue Line at a glance

Line numberLine 3
Stations23
Length28.99 km
Opened2018-09-24
TypeStandard gauge
Electrification25 kV AC overhead
Daily ridership280,000
PhasePhase 1

Plan your journey

Find the best route across all lines

Open route planner