Line 6Kolkata Metro · Metro Railway

Orange Line

Kavi SubhashHemanta Mukhopadhyay · New Garia–Airport corridor, operational between Kavi Subhash and Hemanta Mukhopadhyay. Interchanges with Blue Line at Kavi Subhash.

5
Stations
5.4 km
Total length
2024
Year opened
~12 min
End-to-end time
Plan a route on this line

5 stations

Kavi SubhashTerminus
⬆ ELZ1+0 min
New Garia · Garia Railway Station · New Garia
3 min · 1.4 km
Satyajit Ray
⬆ ELZ1+3 min
3 min · 1.4 km
Jyotirindra Nandi
⬆ ELZ1+6 min
3 min · 1.3 km
Kavi Sukanta
⬆ ELZ1+9 min
3 min · 1.4 km
VIP Bazar · VIP Bazar

About Orange Line

The Orange Line (Line 6) runs 5.4 km from Kavi Subhash to Hemanta Mukhopadhyay, serving 5 stations. New Garia–Airport corridor, operational between Kavi Subhash and Hemanta Mukhopadhyay. Interchanges with Blue Line at Kavi Subhash.

The line opened in 2024. An end-to-end journey takes about 12 minutes. Of the 5 stations, 0 are underground and 5 are elevated, with 1 interchange station(s) connecting to the wider network.

Frequently asked questions

Orange Line at a glance

Line numberLine 6
Stations5
Length5.4 km
Opened2024-03-15
Typebroad
Electrification750 V DC third rail
Daily ridership30,000
PhasePhase 1

Plan your journey

Find the best route across all lines

Open route planner