KennedyBayview
50 分钟9 3.3Toronto Subway
规划路线

Kennedy 到达 Bayview

ShortestShortest Route
Kennedy
站台 1·underground·Line 2 (Bloor–Danforth)开往 Kipling
首班车: 06:00末班车: 01:30Doors open: right
Main Street
+4.17 分钟
4.17 分钟 · 2.02 km
Pape
+8.32 分钟
4.15 分钟 · 2.01 km
Broadview
+12.49 分钟
4.17 分钟 · 2.02 km
Castle Frank
+16.64 分钟
4.15 分钟 · 2.01 km
Bloor–Yonge
yellow 换乘
Arrive Platform 3·underground10.08 km
首班车: 06:00末班车: 01:30

换乘站 Bloor–Yonge — 5 分钟

站台 3 · Line 1 (Yonge–University) ·站台 1 开往 Finch

+5 分钟
Bloor–Yonge
green 换乘
站台 1·underground·Line 1 (Yonge–University)开往 Finch
首班车: 06:00末班车: 01:30Doors open: right
St Clair
+5.55 分钟
5.55 分钟 · 2.78 km
Eglinton
+11.09 分钟
5.54 分钟 · 2.77 km
Sheppard–Yonge
purple 换乘
Arrive Platform 1·underground8.32 km
首班车: 06:00末班车: 01:30

换乘站 Sheppard–Yonge — 5 分钟

站台 1 · Line 4 (Sheppard) ·站台 3 开往 Sheppard–Yonge

+5 分钟
Sheppard–Yonge
yellow 换乘
站台 3·underground·Line 4 (Sheppard)开往 Sheppard–Yonge
首班车: 06:00末班车: 01:30Doors open: right
Bayview
Arrive Platform 1·underground1.38 km
首班车: 05:00末班车: 23:00

Route on the map

92换乘
Sheppard–YongeEglintonSt ClairBloor–YongeCastle FrankBroadviewPapeMain StreetAKennedyBBayview
出发到达

行程概览

50 分钟
Total time
9
19.78 km
Distance
2
Interchanges

首末班车

Station首班车末班车
Kennedy06:0001:30
Bayview05:0023:00
Weekday timings. On Sundays & public holidays, first trains run ~30 min later. Frequency: every 2-4 min (peak), 5-8 min (off-peak).

票价与智能卡

Token fare
3.3
Buy at counter or TVM
智能卡
3.3
Save ₹0 per ride
Off-peak smart card
3.3
Save ₹0 per ride
Use your Toronto Subway smart card or QR ticketwhere supported by the operator, app, or station counter.
Fare guide

绿色出行

2.67 kg
CO₂ saved
vs driving a car
1.23 L
Fuel saved
petrol equivalent
~79 min
Rush-hour saved
vs road traffic
~70 kcal
Calories burned
walking to platform

费用对比

Metro
3.3
Bike
128
Auto
268
Cab
486

Estimates for 19.78 km. Metro is fare-per-person; auto/cab can be shared.

常见问题

热门路线

Departure station

Kennedy

underground
Kennedy, Toronto, Canada
Weekdays: 06:0001:30(Sundays from 06:00)
Zone 1 · 2 entry points
Key exits
1
Kennedy exit 1· Kennedy area
2
Kennedy exit 2· Kennedy area
Buy a ticket or top up a transit card; keep it until you exit.
设施
LiftsEscalatorsToiletsTicket machines
Arrival station

Bayview

underground
Bayview, Toronto, Canada
Weekdays: 05:0023:00(Sundays from 05:00)
Zone 1 · 2 entry points
设施
LiftsEscalatorsToiletsTicket machines