Line 2 (Bloor–Danforth)Toronto Subway · TTC

Line 2 (Bloor–Danforth)

KiplingKennedy · Line 2 (Bloor–Danforth) of the Toronto Subway.

14
Stations
26.2 km
Total length
1966
Year opened
~55 min
End-to-end time
Plan a route on this line

14 stations

KiplingTerminus
⬇ UGZ1+0 min
Kipling area · Kipling area
4.2 min · 2.0 km
Islington
⬇ UGZ1+4.2 min
4.2 min · 2.0 km
Jane
⬇ UGZ1+8.4 min
4.2 min · 2.0 km
Dundas West
⬇ UGZ1+12.6 min
4.2 min · 2.0 km
Lansdowne
⬇ UGZ1+16.8 min
4.2 min · 2.0 km
Spadina
⬇ UGZ1+21 min
Spadina area · Spadina area · Spadina area
4.2 min · 2.0 km
St George
⬇ UGZ1+25.2 min
University of Toronto · University of Toronto · University of Toronto
4.2 min · 2.0 km
Bay
⬇ UGZ1+29.4 min
4.2 min · 2.0 km
Bloor–Yonge
⬇ UGZ1+33.6 min
Yorkville · Yorkville · Yorkville
4.2 min · 2.0 km
Castle Frank
⬇ UGZ1+37.8 min
4.2 min · 2.0 km
Broadview
⬇ UGZ1+42 min
4.2 min · 2.0 km
Pape
⬇ UGZ1+46.2 min
4.2 min · 2.0 km
Main Street
⬇ UGZ1+50.4 min
4.2 min · 2.0 km
KennedyTerminus
⬇ UGZ1+54.6 min
Kennedy area · Kennedy area

About Line 2 (Bloor–Danforth)

The Line 2 (Bloor–Danforth) (Line 2 (Bloor–Danforth)) runs 26.2 km from Kipling to Kennedy, serving 14 stations. Line 2 (Bloor–Danforth) of the Toronto Subway.

The line opened in 1966. An end-to-end journey takes about 55 minutes. Of the 14 stations, 14 are underground and 0 are elevated, with 3 interchange station(s) connecting to the wider network.

Frequently asked questions

Line 2 (Bloor–Danforth) at a glance

Line numberLine 2 (Bloor–Danforth)
Stations14
Length26.2 km
Opened1966-02-25
TypeStandard gauge
Electrification750 V DC third rail
Daily ridership520,000
PhasePhase 1

Plan your journey

Find the best route across all lines

Open route planner