Line 4 (Sheppard)Toronto Subway · TTC

Line 4 (Sheppard)

Sheppard–YongeDon Mills · Line 4 (Sheppard) of the Toronto Subway.

5
Stations
5.5 km
Total length
2002
Year opened
~12 min
End-to-end time
Plan a route on this line

5 stations

Sheppard–Yonge area · Sheppard–Yonge area · Sheppard–Yonge area
3 min · 1.4 km
Bayview
⬇ UGZ1+3 min
3 min · 1.4 km
Bessarion
⬇ UGZ1+6 min
3 min · 1.4 km
Leslie
⬇ UGZ1+9 min
3 min · 1.4 km
Don MillsTerminus
⬇ UGZ1+12 min
Don Mills area · Don Mills area

About Line 4 (Sheppard)

The Line 4 (Sheppard) (Line 4 (Sheppard)) runs 5.5 km from Sheppard–Yonge to Don Mills, serving 5 stations. Line 4 (Sheppard) of the Toronto Subway.

The line opened in 2002. An end-to-end journey takes about 12 minutes. Of the 5 stations, 5 are underground and 0 are elevated, with 1 interchange station(s) connecting to the wider network.

Frequently asked questions

Line 4 (Sheppard) at a glance

Line numberLine 4 (Sheppard)
Stations5
Length5.5 km
Opened2002-11-22
TypeStandard gauge
Electrification750 V DC third rail
Daily ridership50,000
PhasePhase 1

Plan your journey

Find the best route across all lines

Open route planner