Line 7Mumbai Metro · MMRDA

Red Line

Dahisar EastGundavali · Western Express Highway corridor from Dahisar East to Gundavali (Andheri East). Interchanges with the Yellow Line at Dahisar East and connects to the Blue Line near Andheri.

14
Stations
16.5 km
Total length
2022
Year opened
~36 min
End-to-end time
Plan a route on this line

14 stations

Dahisar EastTerminus
⬆ ELZ1+0 min
Dahisar Check Naka · Dahisar Check Naka · Dahisar Check Naka
2.8 min · 1.3 km
Ovaripada
⬆ ELZ1+2.8 min
2.8 min · 1.3 km
Rashtriya Udyan
⬆ ELZ1+5.6 min
2.8 min · 1.3 km
Devipada
⬆ ELZ1+8.4 min
2.8 min · 1.3 km
Magathane
⬆ ELZ1+11.2 min
2.8 min · 1.3 km
Poisar
⬆ ELZ1+14 min
2.8 min · 1.3 km
Akurli
⬆ ELZ1+16.8 min
2.8 min · 1.3 km
Kurar
⬆ ELZ1+19.6 min
2.8 min · 1.3 km
Dindoshi
⬆ ELZ1+22.4 min
2.8 min · 1.3 km
Aarey
⬆ ELZ1+25.2 min
2.8 min · 1.3 km
Goregaon East
⬆ ELZ1+28 min
2.8 min · 1.3 km
Jogeshwari East
⬆ ELZ1+30.8 min
2.8 min · 1.3 km
Mogra
⬆ ELZ1+33.6 min
2.8 min · 1.3 km
GundavaliTerminus
⬆ ELZ1+36.4 min
Andheri East · Andheri East

About Red Line

The Red Line (Line 7) runs 16.5 km from Dahisar East to Gundavali, serving 14 stations. Western Express Highway corridor from Dahisar East to Gundavali (Andheri East). Interchanges with the Yellow Line at Dahisar East and connects to the Blue Line near Andheri.

The line opened in 2022. An end-to-end journey takes about 36 minutes. Of the 14 stations, 0 are underground and 14 are elevated, with 1 interchange station(s) connecting to the wider network.

Frequently asked questions

Red Line at a glance

Line numberLine 7
Stations14
Length16.5 km
Opened2022-04-02
TypeStandard gauge
Electrification25 kV AC overhead
Daily ridership180,000
PhasePhase 2

Plan your journey

Find the best route across all lines

Open route planner