14 stations
Dahisar EastTerminus
⬆ ELZ1+0 min
Dahisar Check Naka · Dahisar Check Naka · Dahisar Check Naka
2.8 min · 1.3 km
Ovaripada
⬆ ELZ1+2.8 min
2.8 min · 1.3 km
Rashtriya Udyan
⬆ ELZ1+5.6 min
2.8 min · 1.3 km
Devipada
⬆ ELZ1+8.4 min
2.8 min · 1.3 km
Magathane
⬆ ELZ1+11.2 min
2.8 min · 1.3 km
Poisar
⬆ ELZ1+14 min
2.8 min · 1.3 km
Akurli
⬆ ELZ1+16.8 min
2.8 min · 1.3 km
Kurar
⬆ ELZ1+19.6 min
2.8 min · 1.3 km
Dindoshi
⬆ ELZ1+22.4 min
2.8 min · 1.3 km
Aarey
⬆ ELZ1+25.2 min
2.8 min · 1.3 km
Goregaon East
⬆ ELZ1+28 min
2.8 min · 1.3 km
Jogeshwari East
⬆ ELZ1+30.8 min
2.8 min · 1.3 km
Mogra
⬆ ELZ1+33.6 min
About Red Line
The Red Line (Line 7) runs 16.5 km from Dahisar East to Gundavali, serving 14 stations. Western Express Highway corridor from Dahisar East to Gundavali (Andheri East). Interchanges with the Yellow Line at Dahisar East and connects to the Blue Line near Andheri.
The line opened in 2022. An end-to-end journey takes about 36 minutes. Of the 14 stations, 0 are underground and 14 are elevated, with 1 interchange station(s) connecting to the wider network.
Frequently asked questions
Red Line at a glance
Line numberLine 7
Stations14
Length16.5 km
Opened2022-04-02
TypeStandard gauge
Electrification25 kV AC overhead
Daily ridership180,000
PhasePhase 2
Plan your journey
Find the best route across all lines