Line 2AMumbai Metro · MMRDA

Yellow Line

Dahisar EastD.N. Nagar · Western suburbs corridor from Dahisar East to D.N. Nagar. Interchanges with the Red Line at Dahisar East and the Blue Line at D.N. Nagar.

17
Stations
18.6 km
Total length
2022
Year opened
~42 min
End-to-end time
Plan a route on this line

17 stations

Dahisar EastTerminus
⬆ ELZ1+0 min
Dahisar Check Naka · Dahisar Check Naka · Dahisar Check Naka
2.6 min · 1.2 km
Anand Nagar
⬆ ELZ1+2.6 min
2.6 min · 1.2 km
Rushi Sankul
⬆ ELZ1+5.2 min
2.6 min · 1.2 km
IC Colony
⬆ ELZ1+7.8 min
2.6 min · 1.2 km
Eksar
⬆ ELZ1+10.4 min
2.6 min · 1.2 km
2.6 min · 1.2 km
Shimpoli
⬆ ELZ1+15.6 min
2.6 min · 1.2 km
Mahavir Nagar
⬆ ELZ1+18.2 min
2.6 min · 1.2 km
Kamraj Nagar
⬆ ELZ1+20.8 min
2.6 min · 1.2 km
Charkop
⬆ ELZ1+23.4 min
2.6 min · 1.2 km
Malad West
⬆ ELZ1+26 min
2.6 min · 1.2 km
Kasturba Chowk
⬆ ELZ1+28.6 min
2.6 min · 1.2 km
Bangur Nagar
⬆ ELZ1+31.2 min
2.6 min · 1.2 km
Goregaon West
⬆ ELZ1+33.8 min
2.6 min · 1.2 km
Oshiwara
⬆ ELZ1+36.4 min
2.6 min · 1.2 km
Lower Oshiwara
⬆ ELZ1+39 min
2.6 min · 1.2 km
D.N. NagarTerminus
⬆ ELZ1+41.6 min
DN Nagar · Andheri West · DN Nagar

About Yellow Line

The Yellow Line (Line 2A) runs 18.6 km from Dahisar East to D.N. Nagar, serving 17 stations. Western suburbs corridor from Dahisar East to D.N. Nagar. Interchanges with the Red Line at Dahisar East and the Blue Line at D.N. Nagar.

The line opened in 2022. An end-to-end journey takes about 42 minutes. Of the 17 stations, 0 are underground and 17 are elevated, with 2 interchange station(s) connecting to the wider network.

Frequently asked questions

Yellow Line at a glance

Line numberLine 2A
Stations17
Length18.6 km
Opened2022-04-02
TypeStandard gauge
Electrification25 kV AC overhead
Daily ridership200,000
PhasePhase 2